Why Screw Piles Are Faster Than Concrete: The Complete Time-Saving Breakdown

  • DownForce Piling
  • Jun 6
  • 2 min read

In Calgary's short construction season, time equals money. That's why savvy builders and homeowners are switching to screw pile foundations - projects that once took weeks with concrete now finish in days. At Down Force Piling, we've perfected the fastest installation methods without compromising quality. Here's exactly how screw piles save you time at every stage.




Why Screw Piles Are Faster Than Concrete?



The Speed Advantage: Stage-by-Stage Comparison


1. Preparation Phase

  • Screw Piles:

    • No extensive excavation

    • No formwork building

    • No ground prep beyond minor leveling

  • Concrete:

    • Full site excavation

    • Form construction (1-3 days)

    • Gravel base compaction

Time Saved: 2-5 days


2. Installation Process

  • Screw Piles:

    • Hydraulic installation (5-30 minutes per pile)

    • Immediate load capacity

    • No weather delays (works to -20°C)

  • Concrete:

    • Truck scheduling required

    • Continuous pouring (no breaks)

    • Temperature sensitive

Time Saved: 3-7 days


3. Curing Period

  • Screw Piles:

    • Build immediately after install

    • No strength development wait

  • Concrete:

    • 7-day minimum cure time

    • 28 days for full strength

    • Winter requires heated enclosures

Time Saved: 1-4 weeks


Real-World Time Savings

Project Type

Screw Piles

Concrete

Days Saved

Residential Deck

1 day

14 days

13

Garage Addition

2 days

21 days

19

Whole House Foundation

3 days

35 days

32


4 Hidden Time Factors Most Contractors Miss

  1. No Weather Delays

    • Install piles in rain, snow, or freezing temps

    • No wet concrete to protect

  2. Earlier Inspections

    • Get framing inspections sooner

    • Keep project timelines tight

  3. Trades Can Work Sooner

    • Electricians, plumbers don't wait for cure

    • Overlapping schedules possible

  4. No Seasonal Shutdowns

    • Work through winter without heaters

    • Extend your building season


Calgary-Specific Speed Benefits

Bypass Frost Delay - Install straight through frozen ground

Clay Soil Adaptation - No waiting for ideal moisture content

Short Season Maximization - More projects per year

 
 